Copperkins

This is our largest project to date and involved getting planning permission for two 3,500 sq ft executive houses. The existing property on the site was a bat roost so mitigation measures including the installation of new bat roosts in the double garage roofs.

The properties were constructed using SIPS method of construction. 5,000 litre rainwater harvesting tanks were installed in each property to allow grey water to be used for toilet flushing. The site is some 2/3 acre in size and was fully landscaped and included electric gates and a video entry system.